The Central Government launched the project for the development of the stretch of 37 km of the National Waterway-four (NW-4) between Sholinganallur to Kalpakkam in South Buckingham Canal in Tamil Nadu.

Lengths of Individual Stretches (NW-4)
StretchLength in km
Kakinada canal50
Eluru canal139
Krishna river section157
Godavari river section171
Commamur canal113
North Buckingham canal316
South Buckingham canal110
Marakkanam-Pondicherry section22
Total1095
  • Main components of the project: To search and excavate for developing navigational channel, construct three terminals and navigational locks, replace the one existing bridge at Kelambakkam, and install the navigational aids.
  • Sanctioned over Rs.123 crore for the purpose and the project is expected to be completed in two years.
  • Other stretches of the NW-4 would cover the states of Andhra Pradesh, Tamil Nadu and Puducherry.
  • NW-4 covers a total length of 1,078 Km consisting of Kakinada-Puducherry canal systems integrated with Godavari and KrishnaRivers. 
Benefits of National Waterway-4 project
  • Improve the drainage system during flood season in Chennai city.
  • Suitable for safe navigation of cargo vessels up to 300 ton capacity for transportation of general cargo viz. food grain, fertilizers, building materials, etc.
  • Suitable for movement of the passenger and tourist vessels of higher capacity from Chennai to Mahabalipuram and in future upto Puducherry and vice versa.
  • The terminals at Shollinganallur, Mutukkad and Mahabalipuram have been planned for construction and will be operated with necessary facilities for cargo, passenger and tourist vessels. 